Drawing calculator
Revision quantity change calculator
Compare two issues by fixture type and see what to add, remove, or keep.
Compare drawing issues
Use one row per fixture type. Enter 0 when a type is absent from an issue.
| Fixture type | Original count | Revised count | Remove row |
|---|---|---|---|
Net quantity change0 fixtures
10 original → 10 revised. Add 2 and remove 2 across the order.
Change by fixture type
- A
- Remove 2
- B
- Add 1
- C
- Add 1
How it works
Use the same project scope and type schedule for both issues. Subtract the original quantity from the revised quantity in each row. A positive result increases the order for that type. A negative result decreases it.
Worked example
In the warehouse exercise two storage-bay A fixtures change to B, and a loading-dock B becomes C. The type counts move from 6 A, 3 B, 1 C to 4 A, 4 B, 2 C. The order loses two A, gains one B and one C, and still totals ten lights.