Trace a fixture to its panel schedule

Office suite, sheet E-201, issue A. Read the circuit printed beside each fixture, then find that circuit in the schedule.

Panel LP2 · lighting schedule
CircuitServes
LP2-1South workstations and reception
LP2-3Meeting and open-office north row
LP2-5Private office lighting

OF-301 · Reception · branch LP2-1

Which schedule description applies to OF-301?

OF-101 · Open office · branch LP2-3

Which schedule description applies to OF-101?

OF-401 · Private office · branch LP2-5

Which schedule description applies to OF-401?

Use this skill on the free coffee shop drawing →

Ready to work across multiple sheets? The $39 workbook includes an annex plan, schedule and addendum to reconcile.

Start at a fixture you can identify

On Alder Office sheet E-201, locate OF-301 in reception. Its type is C, a wall light. The printed circuit reference is LP2-1. In this exercise LP2 is the panel name and 1 is the circuit designation. Carry both parts into the schedule lookup.

The schedule excerpt pairs LP2-1 with south workstations and reception. That last word gives you an independent check against the room label. A full panel schedule can also include header information, load summaries and other fields. This exercise uses the circuit table to answer a drawing-reading question.

E-201 · Alder Office · Original issue
OF-301 · Type CWall light · ReceptionLP2-1
Three lookups on Alder Office E-201, issue A
FixtureLocationCircuitSchedule description
OF-301ReceptionLP2-1South workstations and reception
OF-103Open officeLP2-3Meeting and open-office north row
OF-401Private officeLP2-5Private office lighting

Trace the same relationship in reverse

Start at the LP2-3 schedule row. Its description mentions the meeting room and the open-office north row. Return to the plan and collect the tags on that circuit. You should have three fixtures in the north row and two in the meeting room.

On issue A, the three north-row fixtures are type A. The meeting room adds one A and one B, making the branch order four A and one B. Including the south row because it is in the same open office would pull in three lights on LP2-1.

Keep a traceable answer

Write the sheet issue, the individual fixture tag and the full circuit label in one line before checking the schedule description. A record such as “E-201 Rev A, OF-301, LP2-1, reception” lets a classmate repeat your lookup.

An odd-looking result can still be correct. Two adjacent lights can serve different areas on this sheet. Recheck the printed identifiers and the schedule when the drawing layout tempts you to guess by proximity.

Check your understandingIf you stop counting LP2-3 at the meeting-room wall, what have you missed?

The three type A fixtures OF-101, OF-102 and OF-103 in the north row of the open office. All three carry LP2-3.